100 A or 200 A: Load Math, Not Guesswork

Panel size follows simultaneous demand: add a heat pump, an EV charger and an electric range, and many 100 A homes run out.

Updated 2026-11-21 · Formula checked

How it is calculated

Use a code-based load calculation, not a sum of nameplate ratings.

List what can run at the same time: HVAC, hot water, cooking, EV.

If the result is near the limit, plan 200 A or a load management device.

What comes with it

Feed, mast and meter may change too, and that is the longest lead item.

Check grounding and bonding.

Line up permits and utility coordination early.

Sources

Reading Quotes: Three Exclusions That Add CostRead guide

Check your use case first

Five things to check before ordering

How to compare specs

When not to buy

Budget and alternatives

Common mistakes

How we check these numbers

This guide does three things: it breaks costs and conditions into checkable line items, it marks which figures come from official sources, and it flags what varies by city, year or personal situation. We do not treat a single quote as a universal conclusion, and we do not cite percentages we cannot trace.

If you remember one thing: use the checklist here to question quotes, not a single total to compare them.

KEEP READING

Keep reading

Read in order, or jump to another guide on the same topic.

All guides →

None

Top picks

Licensed Electrician

Electrician

Check price
200A Panel

Panel

Check price
Inspection

Inspection

Check price

Affiliate disclosure: this page links to commercial partners; we currently pass no tracking parameters, so we earn no commission from them.

Sources